Cycling: Kensington High Street

Department for Transport written question – answered at on 21 July 2021.

Alert me about debates like this

Photo of Andrew Slaughter Andrew Slaughter Labour, Hammersmith

To ask the Secretary of State for Transport, how much funding was allocated to the Royal Borough of Kensington and Chelsea for the building of the temporary cycle infrastructure on Kensington High Street, and whether those funds are planned to be clawed back following the removal of the scheme in response to his Department’s guidance to local authorities.

Photo of Chris Heaton-Harris Chris Heaton-Harris Minister of State (Department for Transport)

Since the start of the COVID-19 pandemic, the Royal Borough of Kensington and Chelsea has been allocated a total of around £1 million from the Department’s Active Travel Fund and Transport for London’s London Streetspace Programme. This has supported a number of active travel measures in its area in response to the pandemic including school streets, low traffic neighbourhoods, changes to the public realm to allow greater social distancing, and cycle lanes like the one on Kensington High Street. Funding is generally transferred once schemes are delivered and once claims are brought forward by each Borough, meaning that the total amount of funding provided to date is much less than the total allocated. Borough payments are due to be finalised in September 2021, and will reflect scheme delivery in each area. No funding has been or will be provided to the Royal Borough to cover the costs of removing the cycle lane on Kensington High Street.

In common with other authorities in London and elsewhere, the Royal Borough’s performance in delivering active travel infrastructure is being taken into account in all future funding allocations. The delivery of active travel schemes in London and decisions on active travel funding for individual boroughs are overseen by a group including senior representatives from the Department for Transport and Transport for London.

The Department will be issuing updated statutory Network Management Duty guidance to all local transport authorities shortly which will make clear that they should always leave cycling and walking schemes in place for long enough for their impacts to be properly assessed.