Waterloo Station

Transport written question – answered on 30th March 2010.

Alert me about debates like this

Photo of Susan Kramer Susan Kramer Liberal Democrat, Richmond Park

To ask the Minister of State, Department for Transport with reference to the answer to the hon. Member for Kingston and Surbiton of 18 November 2008, Official Report, columns 271-73W, on Waterloo station, what the timetable is for the (a) physical integration with the domestic terminal and (b) return to operational use of platforms 20 to 24 of Waterloo International Terminal.

Photo of Chris Mole Chris Mole Parliamentary Under-Secretary, Department for Transport

Work to convert platform 20 of Waterloo International for domestic usage has been completed.

Discussions continue between the Department for Transport, Network Rail and Stagecoach South West Trains to agree the most appropriate way to integrate the remainder of the former Eurostar platforms at Waterloo International terminal for use by domestic train services.

The Office of Rail Regulation issued a letter to Network Rail on 3 September 2009 which included specific requirements in respect of the use of Waterloo and Waterloo International stations as part of the Control Period 4 (2009-14) enhancements delivery plan for Network Rail. A copy of this letter is available at:

www.rail-reg.gov.uk/upload/pdf/enh-cp4dp-030909.pdf