Defence written question – answered at on 20 July 2009.
Mike Hancock
Liberal Democrat, Portsmouth South
To ask the Secretary of State for Defence what the estimated cost to the public purse is of the Principal Anti Air Missile System; and what the estimated cost is of the construction of HMS Daring.
Quentin Davies
Parliamentary Under-Secretary (Ministry of Defence) (Defence Equipment and Support), Parliamentary Under-Secretary, Ministry of Defence
As set out in the Major Projects Report 2008 (MPR08), the total procurement cost of the Type 45 programme is £6.5 billion. This includes the design and manufacture costs for all six Type 45s to be built and the Principal Anti Air Missile System (PAAMS), renamed Sea Viper by the Royal Navy. These costs are broadly split 60 per cent. for the ship and 40 per cent. for the weapons system. As set out in MPR08, the unit production cost for each Type 45, including PAAMS, is £649 million.
Secretary of State was originally the title given to the two officials who conducted the Royal Correspondence under Elizabeth I. Now it is the title held by some of the more important Government Ministers, for example the Secretary of State for Foreign Affairs.