Part of the debate – in the Scottish Parliament at on 21 March 2019.
When there is a fault with the barrier system, staff need to be deployed outside in all weathers. Surely there is a greater risk to the building because the barrier system is down. What further measures can be put in place to reduce the risks to staff and the building?