Part of High Speed Rail (Preparation) Bill – in a Public Bill Committee at 4:13 pm on 11 July 2013.
Over the last two days we have heard from various witnesses some specific concerns about the detail of the route, for example, the link to High Speed 1 by the North London line and the potential remodelling of Euston. To what extent are these alternative options still on the table, and is the extra contingency fund that has been announced there to cover these potential changes in design?