Part of Planning and Infrastructure Bill - Committee (3rd Day) – in the House of Lords at 3:45 pm on 1 September 2025.
Baroness Taylor of Stevenage
Parliamentary Under-Secretary (Housing, Communities and Local Government), Baroness in Waiting (HM Household) (Whip)
3:45,
1 September 2025
My Lords, it is reassuring to hear such a degree of consensus across the House that we all want to deliver the same thing from this—speeding up the connections process. I have expressed my frustration many times before in this House that it can take longer to get a grid connection than it did to build the whole of the A1(M). That is a just a nonsense and we have to move on from it.
I thank all noble Lords who have spoken in this brief debate, particularly the noble Lord, Lord Lansley, and the noble Earl, Lord Russell, for their amendments, and the noble Baronesses, Lady Neville-Rolfe and Lady Coffey, for their comments.
I am afraid I have to oppose the amendments from the noble Lord, Lord Lansley. I understand how well intentioned they are and I greatly respect his experience in these areas, but they would have significant unintended consequences for the Government’s ability to respond swiftly and effectively to the evolving needs of our energy system.
At the heart of the amendments is a proposal to require that the strategy and policy statement, also known as SPS, designated under Part 5 of the Energy Act 2013 is used for the purpose of prioritising connections to the electricity network. I recognise the helpful attempt by the noble Lord to ensure consistency and clarity with regard to the obligations of Ofgem and the National Energy System Operator, NESO. I also fully recognise the importance of parliamentary scrutiny and do not for a moment suggest that we should seek to avoid that. But we must also be honest about the practical implications of this approach.
The SPS is subject to a rigorous process that is entirely appropriate for a high-level, overarching statement of policy. But it is not designed to accommodate the pace or specificity required to support the complex and fast-moving reforms we are undertaking to unblock and accelerate electricity network connections. We are entering a period of rapid transformation. The grid must decarbonise. New technologies are emerging. Electricity demand is shifting and increasing and the connections process must evolve to keep up.
In that context, the Government must be able to designate timely targeted guidance, potentially in the form of multiple documents, tailored to different parts of the sector, such as generation or demand connections, or technology-specific plans and strategies. Indeed, the Government have already signalled their intention to designate the Clean Power 2030 Action Plan and the Industrial Strategy—both existing documents published recently—when the necessary powers are available. These are concrete, strategic documents that will help the industry to plan and invest with confidence, hopefully meeting some of the concerns of the noble Baroness, Lady Neville-Rolfe. But these amendments would prevent that. They would limit us to a single document—the SPS—and, in doing so, tie our hands at precisely the moment we need the most flexibility, creating potential delays and preventing the granular and specific strategic direction required for the grid connection process.
There is a further and more fundamental issue. Distribution network operators—DNOs—have no legal obligation to have regard to the SPS. These companies are critical to the delivery of connections reform and are responsible for connecting a significant volume of new generation and storage that will connect directly to the distribution network. They are privately owned and operated and the SPS was never intended to bind them. To attempt to do so now would be not only inappropriate but unworkable.
If we are serious about reforming the connections process—as I believe we are; we have heard that this afternoon—we must ensure that our strategic plans can apply to the full range of actors involved. That means having the ability to designate plans that are fit for purpose, timely and applicable to the right parties. The strategy and policy statement is a high-level strategic document intended to provide Ofgem and NESO with clear direction over the Government’s strategic priorities and desired outcomes for the duration of our term to inform decision-making. In contrast, as I have said, designated plans for the purpose of connections reform may include more granular, tactical guidance. These documents are designed to complement, not conflict with, the SPS.
In response to the noble Lord, Lord Lansley, I would also say that plans are in place and being implemented for the connections to the transmission and distribution system. In November 2023, as the noble Lord mentioned, the Connections Action Plan was published, setting out expectations for the scale and pace of reform. This formed the basis for the National Energy System Operator’s connection reform proposals, which Ofgem have just approved. The broad ambition, on which legislative measures have been based, will see faster electricity network connection dates offered, at both transmission and distribution.
The noble Lord asked me a very specific question around the Gate 2 process. The implementation of current connection reforms is under way, as I said. We are working closely with NESO and Ofgem, and we are anticipating the Gate 2 decisions in the coming weeks; “coming weeks” is one of those expressions that I have got used to as I have been a Minister.
The Bill as drafted is intended to ensure that we have the tools to deliver the energy transition effectively. The measure as drafted strikes the right balance. We believe that it provides a clear mechanism for designating strategic plans while preserving the flexibility —which we know we will need—to respond to a rapidly changing sector. I therefore kindly ask the noble Lord not to press his amendments.
I turn now to Amendment 79, tabled by the noble Earl, Lord Russell. He said that he believes this is the biggest change since the Industrial Revolution in terms of power accessibility. I do not disagree with that statement. Let me begin by stating that we are in full agreement that the current delays arising from the first come, first served approach to grid connections are absolutely no longer tenable; I hope I have made that very clear. For this reason, in December 2024, the Government published the Clean Power 2030 Action Plan. This document outlines our plan to work collaboratively with the National Energy System Operator—NESO—and Ofgem to deliver a fundamental overhaul of the connections process.
The objective is to accelerate connection timelines for the most critical projects and to unlock billions of pounds of investment for renewable energy generation. Through the implementation of these reforms, it is estimated that up to £5 billion in unnecessary network reinforcements could be avoided. In turn, this should lead to long-term savings for consumers through lower electricity Bills.
The reforms in question have been developed by NESO in close consultation with both industry stakeholders and Ofgem, following all requisite formal procedures, including public consultation. Ofgem has since approved these proposals and implementation is now well under way, as I have already mentioned.
This Bill is intended to support the reforms. Notably, the Bill will confer powers on the Secretary of State to designate strategic plans. These plans must be taken into account by both NESO and distribution network operators when exercising their functions in relation to grid connections.
It is anticipated that the Secretary of State will initially designate the Clean Power 2030 Action Plan and the Industrial Strategy, followed in due course by the proposed strategic spatial energy plan. These strategic documents are designed to reflect the needs of the nation’s energy system, including measures to address the inefficiencies of the current grid queue by prioritising projects of greatest national importance. Introducing a new statutory requirement for a further plan would risk delaying this progress and might introduce unwelcome uncertainty for industry participants.
On the matter of local energy grids, we do not consider that there is any regulatory impediment. The necessary infrastructure, including local networks that integrate both generation and demand, is already permissible. Such networks may be developed and operated by distribution network operators or independent network providers, or under private wire arrangements via statutory licence exemptions.
We are also firmly committed to supporting local and community energy initiatives. These play a vital role in the UK’s broader energy landscape and we are determined to ensure that communities continue to benefit directly from the transition to clean energy. We will be discussing more about that later this afternoon.
To that end, Great British Energy will work in partnership with mayoral combined authorities, community energy organisations and the devolved Administrations. This collaboration will include the provision of funding and strategic support, from planning advice to technical guidance, for local community energy stakeholders. I trust this explanation provides sufficient reassurance to noble Lords.
As a bill passes through Parliament, MPs and peers may suggest amendments - or changes - which they believe will improve the quality of the legislation.
Many hundreds of amendments are proposed by members to major bills as they pass through committee stage, report stage and third reading in both Houses of Parliament.
In the end only a handful of amendments will be incorporated into any bill.
The Speaker - or the chairman in the case of standing committees - has the power to select which amendments should be debated.
Secretary of State was originally the title given to the two officials who conducted the Royal Correspondence under Elizabeth I. Now it is the title held by some of the more important Government Ministers, for example the Secretary of State for Foreign Affairs.
A proposal for new legislation that is debated by Parliament.
Ministers make up the Government and almost all are members of the House of Lords or the House of Commons. There are three main types of Minister. Departmental Ministers are in charge of Government Departments. The Government is divided into different Departments which have responsibilities for different areas. For example the Treasury is in charge of Government spending. Departmental Ministers in the Cabinet are generally called 'Secretary of State' but some have special titles such as Chancellor of the Exchequer. Ministers of State and Junior Ministers assist the ministers in charge of the department. They normally have responsibility for a particular area within the department and are sometimes given a title that reflects this - for example Minister of Transport.