Works at Holborn Gyratory

Questions to the Mayor of London – answered at on 28 September 2022.

Alert me about debates like this

Photo of Caroline Pidgeon Caroline Pidgeon Liberal Democrat

What specific actions have been taken during the month of June by (a) TfL and (b) Camden Council in relation to making Holborn Gyratory safe for cyclists?

Photo of Sadiq Khan Sadiq Khan Mayor of London

Camden Council completed civil engineering works at the junction of Southampton Row and Theobalds Road in June 2022. This included all kerb works to the junction and the completion of cable ducting and resurfacing. Transport for London (TfL) and its contractor have also started work to install the new traffic signals that are required for the enhanced junction.

Design work for the High Holborn section of the gyratory has also continued, with Camden Council engaging with TfL to develop a design which incorporates the necessary safety improvements.