Photo of Patrick McLoughlin Patrick McLoughlin The Secretary of State for Transport 4:50, 14 December 2015

With permission, Mr Speaker, I would like to make a statement about airports policy.

Aviation is a British success story. Today we have the third largest aviation network in the world, second only to the US and China. But with that success comes challenges. Heathrow is full; Gatwick is filling up. If no action is taken, the entire London system will be full by 2040. Yet we need new connections to new cities in new economies. There are other challenges too. Airports create jobs and opportunities. Technology is changing. Planes are becoming quieter and more efficient, but there is still inevitably an environmental impact. For some, the argument seems simple: oppose all expansion anywhere, or back it, but always somewhere else. Yes, there are opportunities in the network of national airports, with global connections from cities such as Birmingham, Edinburgh, Glasgow, Manchester and Newcastle, but growth there will come alongside growth in the south-east, not instead of it.

That is why in September 2012 Sir Howard Davies was asked to lead a commission on the issue. The Airports Commission’s final report was published less than six months ago. It made a strong case for expansion in the south-east, and we have considered that evidence. The Government accept the case for expansion, and the Government accept the commission’s shortlist of options for expansion. We will begin work straight away on preparing the building blocks for an airport national policy statement in line with the Planning Act 2008. Putting this new framework in place will be essential groundwork for implementing the decisions we take on new capacity, wherever it is to be built.

Sir Howard Davies and his team produced a powerful report. The Heathrow Airport Ltd scheme was recommended by the commission, but all three schemes were deemed viable. We are continuing to consider all three schemes, and we want to see action, but we must get the next steps right, for those keen to push ahead with expansion and for those who will be affected by it.

We will therefore undertake a package of further work. First, we must deal with air quality. I want to build confidence that expansion can take place within the legal limits, so we will accept the Environmental Audit Committee’s recommendation to test the commission’s work against the Government’s new air quality plan. Secondly, we must deal with the concerns about noise. I want to get the best possible outcome on this for local residents, so we will engage further with the promoters to make sure that the best package of noise mitigation measures is in place. Thirdly, we must deal with carbon emissions, so we will look at all measures to mitigate carbon impacts and address the sustainability concerns, particularly during construction. Fourthly, we must manage the other impacts on local communities. I want people who stand to lose their homes to be properly compensated for the impacts of expansion, and I want local people to have the best access to the opportunities that expansion will bring, including new jobs and apprenticeships. We will therefore develop detailed community mitigation measures for each of the shortlisted options.

We expect to conclude that package of work by the summer. Critically, that means ensuring that delivery of the timetable for the additional capacity set out by Sir Howard does not alter. The commission reported that an additional runway would be required by 2030, and we intend to meet that requirement. In saying this, I am fully aware that some will wish that we would go further, and others will wish we were making no such progress at all. We are prepared for that, because I want to get this decision right. That means getting the environmental response right and, in the meantime, getting on with the hard work to build the new capacity to the timetable set out by Sir Howard in the commission’s report. I commend this statement to the House.