Railways: Greater London

Department for Transport written question – answered at on 20 March 2015.

Alert me about debates like this

Photo of Tim Loughton Tim Loughton Conservative, East Worthing and Shoreham

To ask the Secretary of State for Transport, what the level of punctuality was for Southern and Thameslink passenger rail services running into London in the last 12 months.

Photo of Claire Perry Claire Perry Parliamentary Under-Secretary (Department for Transport)

The Public Performance Measure for Southern for the last 12 months has been 83.6% (up to 28 February 2015)

Thameslink services were provided by First Capital Connect until 12 September 2014 and by Govia Thameslink Railway since 13 September 2014. The Public Performance Measure for Thameslink services for the last 12 months has been 85.1% (up to 28 February 2015).

The Public Performance Measure for all operators is published online by the Office of Rail Regulation at http://dataportal.orr.gov.uk/browsereports/3