Railways: East Midlands

Transport

Written answers and statements, 28 October 2009

Photo of Graham Stringer

Graham Stringer (Manchester, Blackley, Labour)

To ask the Minister of State, Department for Transport what plans he has to improve the East Midlands peak time train service between Manchester and (a) Merseyside and (b) South Yorkshire.

Photo of Chris Mole

Chris Mole (Parliamentary Under-Secretary, Department for Transport; Ipswich, Labour)

holding answer 26 October 2009

On 23 July the Government announced a major £1.1 billion programme of rail electrification, including the electrification by 2013 of the line between Liverpool and Manchester via Newton-le-Willows.

Electrification of the Liverpool-Manchester route via Newton-le-Willows will enable the operation of high-capacity four-carriage electric trains transferred from the cross-London Thameslink route. These trains will be completely modernised before they are transferred, including the installation of air-conditioning.

This additional capacity on the Liverpool-Manchester line running via Newton-le-Willows will relieve pressure on the other Liverpool-Manchester line running via Warrington.

The diesel trains currently operating on the Liverpool-Manchester line via Newton-le-Willows will be transferred onto other routes, delivering much needed additional capacity.

In the meantime, the Department for Transport is in discussion with train operating companies about delivering additional capacity. This includes discussions with Northern Rail about a first phase of additional rolling stock. The Government will publish an updated rolling stock plan taking account of electrification and setting out a revised strategy this autumn.

Annotations

No annotations

Sign in or join to post a public annotation.